The analysis of mooring arrangement for load transfer phase of Aasta Hansteen platform.

The analysis of mooring arrangement for load transfer phase of Aasta Hansteen platform.

An impressive dual vessel float-over operation of the Aasta Hansteen topside in Norway.

Loa:

Lpp:

Beam:

Draft:

Deadweight:

Cargo hold:

Classification:

 

Transfer of the topside from White Marlin (largest vessel in Dockwise fleet) onto two S-class vessels – operation took part at Westcon Yard.

Westcon Design Poland was responsible to prepare mooring plan during standby and topside transfer and calculations showing maximum tensions in mooring lines, loads on quay bollards and fenders and vessels fenders, fairleads and bollards, Swift vessel offset from initial position.